




The first confirming marker for Interstate 785 stands ahead of the McKnight Mill Road (SR 2835) over crossing.
08/16/21

Interstate 785 ties into I-85 south 6.5 miles ahead at a systems interchange (Exit 21) with I-40. I-85 leads southwest to High Point (29 miles) and Charlotte (104 miles).
08/16/21

North Buffalo Creek meanders northeast from central Greensboro to cross under I-785 one mile out from Exit 17 to Huffine Mill Road.
08/16/21

One mile separates the diamond interchange (Exit 17) with Huffine Mill Road (SR 2770) from U.S. 70 (Burlington Road) to Greensboro and Sedalia along I-785 south.
08/14/21

Burlington Avenue (U.S. 70 west) ties into Wendover Avenue at Perry Road in east Greensboro. Wendover Avenue advances U.S. 70 west to U.S. 29-220 in the Rosewood neighborhood.
08/16/21

Clapp Farms Road spans the Greensboro Urban Loop (I-785/840) ahead of the exchange (Exit 21) with I-40/85.
08/16/21

I-785/I-840 concludes as I-85 continues along the southern arc of the Greensboro Urban Loop. I-85 north joins I-40 east for a 30.6 mile long overlap to Hillsborough.
08/16/21
Photo Credits:
08/14/21, 08/16/21 by AARoads
Connect with:
Interstate 40
Interstate 85
U.S. 29
U.S. 70
Page Updated 01-23-2023.