The Kickapoo Turnpike travels 7.92 miles north from SE 89th Street and IH 40/U.S. 270-SH 3 in southeastern Oklahoma City to U.S. 62 in the city of Harrah. This section of the toll road was completed on January 4, 2021.
10/04/21

The Kickapoo Turnpike opened with the option for cash toll collection. The switch to all electronic tolling (AET) however took place soon thereafter.
10/04/21

The Kickapoo Turnpike heads 18.71 miles north from IH 40 at Exit 170 to IH 44 (Turner Turnpike) at the town of Luther. The toll road was approved as part of an extension of IH 240 by AASHTO in Fall 2021.
10/04/21

A cloverstack interchange joins IH 40 with the Kickapoo Turnpike north of SE 89th Street and the Cleveland County line.
10/04/21

I-40/U.S. 270 was expanded to six overall lanes from Exit 169 / Peebly Road west to the split with Interstate 240 at Exit 165. The $75 million project ran from January 2018 to Summer 2020.
10/04/21

2018/20 road work added auxiliary lanes between the reconfigured diamond interchange (Exit 166) with Choctaw Road and the separation with I-240/SH 3.
10/04/21

Interstate 240 runs 16.74 miles west alongside SH 3 to IH 44 by Will Rogers World Airport (OKC).
10/04/21



Interstate 40 straddles the Midwest City and Oklahoma City line west from Exit 159 / Douglas Boulevard to Exit 157 B for Air Depot Boulevard.
05/06/12

Exit 157C departs I-40/U.S. 270 west for Towne Center Drive and the Eaker Gate to Tinker AFB.
05/06/12

Interstate 40 turns northwest along the Tinker Diagonal ahead of the slip ramp (Exit 157 A) for Hudiburg Drive and Rose State College.
05/06/12

IH 40/U.S. 270 converge with IH 35/U.S. 77 at a sweeping directional T interchange (Exit 153) spanning the North Canadian River.
05/06/12
Photo Credits:
05/06/12, 10/04/21 by AARoads
Connect with:
Interstate 35
Interstate 240
Page Updated 04-30-2022.